|
|
|
|
Try this innovative MS Outlook expansion module that allows systematizing projects, timelines, hourly rates and employees' assignments basing on live time and expenses tracking model enabling automatic calculation of HR costs involved. Download now!
| Cost: $74.95 US |
|
Size: 2525 K |
|
|
|
|
|
|
Related programs:
- Delete 2.10 - DELETE 2.10 -- Enhanced file delete. Options include prompt before delete, overwrite and delete, recursive delete of files and directories, override file attributes, more than one file spec, and delete only files not in master directory.
- Storage Pile Volume 2.2 - Calculate the live and dead volumes of your design of a bulk storage job with unlimited placement of material, withdrawal points, walls, slopes and grades. You will be able to show a visual check of results with presentation grade graphics.
| |
|
|
|
|
|